The construction of the power interconnection between Poland and Lithuania is a crucial element for the creation of a common European energy market. ArcelorMittal supplied steel for the construction of the transmission line's lattice towers in the 112 km section from the Polish town of Ełk to the Lithuanian border.

The aim of this new power line is to connect the Polish and the Lithuanian transmission systems in order to achieve effective operation, further develop the energy market, reduce the isolation of some regions as well as ensure the security of energy supplies. The project also includes the reinforcement and modernisation of the transmission network in North-Eastern Poland to guarantee quality improvement, reliability of electricity supply to the consumers and the security of the energy supplies. In the future, this will allow the integration of all Baltic states' power networks with the networks of the Western European countries to close the so-called Baltic Ring.

The project consists in the construction of four new 400kV overhead power transmission lines with a total length of 400 km and 7 electrical substations, 5 new and 2 existing ones that were modernised. The investments on Polish territory sum up to 450 million Euro (1,8 billion PLN), the project is funded by the EU Infrastructure and Environment Programme. On Lithuanian ground, the transmission line goes from the border with Poland to the city of Alytus.

Section Ełk Bis – Polish border: Lattice towers with ArcelorMittal steel
ArcelorMittal supplied steel for the lattice towers on the 112 km long section between the Polish Ełk Bis power station and  the country's border. This double circuit line passes through 10 municipalities in Poland and connects with the Lithuanian transmission system, continuing on Lithuanian ground another 50 km to the Alytus power station.

ArcelorMittal worked in close collaboration with the engineering company Energoprojekt Krakow SA, and jointly a new series of lattice towers was created. These new EA-33 towers were specifically developed to cover long distances and employ large equal angles L300, produced at the ArcelorMittal Differdange plant in Luxembourg. ArcelorMittal supplied a total of 1.200 tn of L300 angles and another 18.000 tn of different steel sections (also mainly angles) for the towers' load bearing columns.

298 lattice towers of the series EA-33 were used in the project. The height of the towers varies from 70 up to over 90 meters. The tonnage of a single column varies between 21 and 110 tonnes.

The biggest columns consist of over 20 tonnes of L300 angels, which are mainly used at the bottom parts of columns, facing the biggest forces.

The distance between the towers range from 350 to 450 m, the power lines are installed at a minimum height of 13,4 m. This height allows safe operation even for large agricultural machinery. The line area is 70 m, 35 m on each side of the axis. In this area, the land use is restricted.

Construction of the section  Ełk Bis – Polish border started in 2013, completion is planned for October 2015.