PROJECT INFORMATION

  • Madrid
  • Spain
  • Architect:
    ARKITOOLS
  • 2009 - 2012
  • Client
    Institute IMDEA Energía
  • Contractor:
    Sacyr Vallehermoso
  • Photographer:
    ArcelorMittal & Arkitools

LINKS


  Render
  Section V
  Section H
  Ground floor
  First floor
  Second floor
  Sections I
  Sections II
  Product sheet: ST Lumiére
  Product sheet: Hacierba Liner Trays
  Product sheet: Hairplan 300
  Product sheet: ST 300

Institute of Advanced Energy Studies, Madrid


Created by the regional government of Madrid, the mission of the Institute of Advanced Energy Studies is to promote and realize research related to renewable energy and clean energy technologies.

The main requirements for the new building to house these R & D activities around energy technologies were sustainability and flexibility to assure a long service life in the changing conditions of technological progress.
 
Situated in the outskirts of the Spanish capital in a future Technology Park, it was conceived as a modular building in order to allow extension and divisions without affecting the ongoing activities inside or the building’s general appearance.

The central nucleus (module IV) is a 3 storey building with an entrance and distribution hall, offices and common spaces for recreational “get-togethers” – it is the functional and symbolic heart of the complex.

Around this nucleus, modules I and II are arranged, both of them with the same height (level 0 +2).  They accommodate the main investigation areas and laboratories. Like containers, they do not have any vertical structure which allows easy and quick re-distribution or subdivision whenever necessary. On the roof of these buildings, there are technical installations for maintenance of  alternative energy sources.

Module III, arranged on both sides of the central building, consists of two workshops for experimental machinery.

The orientation of the building and the façades of the different functional areas have been carefully considered in the architectural design.

Conceived according to bioclimatic principles, the aim was to keep its energy consumption to a minimum, reducing energy losses, optimizing the comfort inside the building and taking into account the necessities of the different activities carried out in the different modules.

ArcelorMittal Construction Spain was involved in this project right from the beginning. In close collaboration with the architects, innovative and new façade solutions from the ArcelorMittal range could be employed and tailored for this project. In total, 900 m2 of LUMIERE panels (1 mm , in silver metallic), 3500 m2 of the new Hairplan 300 profiles (1 mm silver metallic), 2000 m2 Hacierba 5.200.50 B profiles (0,75 mm silver metallic) and 300 m2 of differently pre-curved ST 300 profiles were supplied.

Sustainability
The IMDEA ENERGIA Building was designed as a Green Building with Energy certification A, according to the requirements of LEED Gold.

- 50% of the construction site was greened, achieving that way more than 40% of garden area.
-  Rainwater is collected on the roofs and stored under ground for watering plants.
- The roof areas exposed to direct solar radiation are equipped with white emugrava with a high solar reflection index (>78) in order to avoid heat island effects.
- The envelope (façade, roofing and structure) provides the whole complex with a passive protection which contributes to the energy efficiency certified as A.
- The parking lot contains special spaces for low emission cars and shared vehicles.
-  The distribution and separations between lecture rooms, laboratories and offices consists of glass partitions allowing a high degree of flexibility and natural light, in the interior as well as exterior.
- Different solutions were employed for curtain walls and structures according to the orientation of the façades. Towards the south and east, the façade cladding consists of sun screens, towards the west the sun screens are adjustable with an automatic control system.
- For the construction of this complex, mainly recycled materials (like steel, aluminium, glass) have been used.
- The employed materials like concrete, rock and ceramic elements were produced in the area in order to avoid long transport.
- The building is equipped with an automatic lighting system and additionally, in the naturally illuminated areas detectors regulate the intensity of the artificial system according to the amount of natural light.

Structure
The main structure is made of reinforced concrete, founded on pillars. 15 of which are part of the building’s geothermal system.

A metal structure supports the terraces of the investigation area and the stairs of Module II, also the workshops (Module III) are built with steel structure on all floors, mainly HEA sections of various types. The horizontal structure consists of concrete slabs, their thicknesses depending on loads and spans, supported by composite beams.

The light metal roof is a construction of beams and purlins, covered with insulated steel profiles.

Text: ARKITOOLS & Constructalia